Development of 115kV Siem Reap – Oddor Meanchey Transmission Line And 115/22kV Oddor Meanchey Substation And 230/22kV Bek Chan Substation Project
Client Name: Schneitec Energy Co., Ltd.
Commencement Date: 22 January 2018
Completion Date: 31 December 2019
The project scope includes following major components:
1. Turnkey construction of approximately 75km +/- 3km double circuit single ACSR Drake conductor transmission line from Oddor Meanchey to Siem Reap (“Transmission Line”).
2. Turnkey construction of a 115/22kV Oddor Meanchey Substation. 3. Turnkey construction of a 230/22kV Bek Chan Substation.